Public transport service and use in Brussels from 1950 to 2017

Offre et fréquentation des transports publics bruxellois de 1950 à 2017
Aanbod en gebruik van het openbaar vervoer in Brussel van 1950 tot 2017
Vincent Carton
Traduction de Jane Corrigan
Cet article est une traduction de :
Offre et fréquentation des transports publics bruxellois de 1950 à 2017 [fr]
Autre(s) traduction(s) de cet article :
Aanbod en gebruik van het openbaar vervoer in Brussel van 1950 tot 2017 [nl]

Résumés

S’appuyant sur les statistiques de la STIB depuis 1950, cet article analyse les choix faits en matière d’offre de transport en commun. D’un réseau basé quasi exclusivement sur le tram, on est passé progressivement à une offre métro-tram-bus retrouvant aujourd’hui son intensité en Km parcourus de 1950. Si le métro a rapidement fait consensus, il n’a pas permis de compenser les réductions de l’offre engendrées par les économies sur l’exploitation du réseau dans les années 1980. Mettre l’essentiel des moyens sur un seul mode, en particulier si sa couverture territoriale est limitée, n’est pas suffisant. Même si la relation entre l’amélioration de l’offre et le gain de clientèle n’est pas automatique, une conclusion apparaît : en 68 ans, la STIB a attiré plus d’usagers à trois reprises lorsqu’elle a amélioré l’offre sur l’ensemble du réseau, surtout les fréquences des trams et des bus, les fréquences du métro ayant toujours été élevées. L’étude éclaire le débat sur les choix possibles : faut-il investir dans une ligne de métro entre Albert et Bordet ou investir dans le réseau de surface (extension au moyen de lignes à « haut niveau de service », protection des trams et bus vis-à-vis du trafic et amélioration des fréquences) ?

Haut de page

Texte intégral

Introduction

1Based on data related to STIB since 1954 and Tramways Bruxellois since 1950, this article analyses the changes in the public transport service in terms of the different modes (tram, bus and underground) and quantity (measured in km-convoys covered by the vehicles or according to the length of the network in particular). It seeks to establish the relationship between these changes as well as the variation in the number of passengers in the network, even if this relationship is neither direct nor immediate, as many factors intervene in the decision to travel and in the choice of mode of transport [for a summary, see De Witte et al., 2013 and Lebrun et al., 2013]. We shall show, however, that the upward and downward trends in the use of the Brussels network correspond with some delay to the major trends in the service.

2Research helps to clarify this question. In his study on urban travel habits, Vincent Kaufmann [2003] pointed out three rationales which explain the choice of mode: the comparative travel times, the cultural predispositions to the use of different means of transport and the rooting of modal habits in lifestyles. Concerning the gain in time provided by public transport, he observed that there was no automatic carryover given the existence of different external factors such as the availability of parking spaces at the place of work or even the perception of travel times. He also pointed out an overall preference for the car linked to the social representations of the two modes and the increased status of the car; the choice of public transport is in this case the result of difficulties related to the use of the car due to parking issues or traffic congestion. Finally, daily activities influence modal choices; it is difficult to reorientate them. For certain journeys, the use of public transport is self-evident; for others, cars are always used. Based on a typology related to a combination of specific reasons for action, Kaufmann came to the conclusion that if there is high-quality service, the choice of public transport constitutes a true possibility for those who have a car, but at the time of the survey (2000) it concerned only one third of the car-owning population (those who are “receptive to the service”). For those who do not own cars, the question of modal choice is raised in different terms. They are forced to examine all possibilities (public transport, cycling, walking, car sharing, etc.) for their necessary journeys and to give up certain non-essential journeys.

3In his study comparing the use of modes in medium-sized urban areas in France, Florian Vanco [2013: 8] showed that “there is a correlation between the number of network kilometres per inhabitant and the use of public transport. For example, the networks which have implemented a number of network kilometres per inhabitant which exceeds the median are used frequently. Other criteria such as urban form, policies to restrict car use and service quality may also favour the frequent use of an urban public transport network”. Vanco also shows that there is a correlation between the theoretical interval of frequency and the use of public transport. According to Georges Bresson [2004], the decrease in the use of public transport is above all related to the increase in car ownership, whereas the use of public transport is quite sensitive to the volume of service and its price.

4We may conclude from this that the improvement of the public transport service contributes to the use of a network, but that it constitutes only part of an urban mobility policy.

5The analyses of the Brussels network published until now usually cover periods of 10 to 15 years [Thiry, 1988; Delepierre-Dramais, 1990]. This article takes a step back and aims at identifying the more long-term effects of the choices made. There is a strong inherent inertia in this domain, related to the length of time involved in the design and realisation of infrastructures, the requirement to take into account the works carried out to define the network, and the amortisation period for the rolling stock. A long-term analysis is therefore fully relevant. We shall show that, despite the inertia of the system, several changes in direction have taken place since 1950. These decisions are considered in the political, economic and social context of the different periods studied.

6The following analysis opens up prospects regarding the current scope of action. Between investments in heavy infrastructure, extension of the network, separation of trams and buses from the traffic, increase in the size of the rolling stock and improvement of frequencies, choices must be made. This retrospective analysis allows us to shed light on them.

1. Method, data and indicators

7The statistical analysis carried out here covers the period from 1950-2017 and concerns the regional public transport operator in Brussels (and therefore not the Flemish and Walloon operators, De Lijn and Tec, which are also active in Brussels). It covers 4 years of network operation by Les Tramways Bruxellois and 64 by the current Société des Transports Intercommunaux de Bruxelles (STIB).

8The quantitative data used concern different facets of the transport service as well as the evolution in the number of passengers recorded in the network. The qualitative indicators for the transport service are not considered here (comfort, information, availability of escalators, etc.). All of the data related to the service and its use come from STIB annual activity reports. These are the official reports of a public limited company; they may be consulted at the head office and on its website for the last years.

9More precisely, the data used concern:

  • the network and its geographical scope: length of route for streets covered by STIB (figure 1) and total length of these lines (figure 2);

  • the service in relation to the circulation of vehicles and their respective capacity: km-convoys in one year (figure 3) and spaces-km provided by these vehicles (figure 4);

  • the waiting time (figure 5), thanks to a calculation of the average annual frequency of vehicles, including wide variations in time and according to the neighbourhoods [Lebrun, 2018].

10These service indicators are used for each of the three modes (tram, bus and underground), as well as for the entire network. They are described in the legends for the figures; the methodological changes in 1995, 2000, 2005 and 2010 adopted by STIB in the establishment of these series are also described. Indicators 1 to 4 and 6 are from data collated between 1950 and 2017 for the different modes (tram, bus – including trolley bus – underground); the other indicators (figures 5, 7, 10 and 13) are the result of a calculation based on these data and statistics from Institut Bruxellois de Statistiques et d’Analyse (IBSA).

Figure 1. Length of route (km), tram, bus (including trolley bus) and underground

Figure 1. Length of route (km), tram, bus (including trolley bus) and underground

This indicator reflects the coverage of the Region by the STIB network, which has been extended according to the urbanisation of Brussels. This indicator does not provide information regarding the operation of the route (How many lines go along it? What are the frequencies?), but instead presents a static view of the geographical coverage of the territory. At the very least, urban sprawl must cause this indicator to increase in order to ensure constant service.

Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017)

Figure 2. Length of line (km), tram, bus (including trolley bus) and underground

Figure 2. Length of line (km), tram, bus (including trolley bus) and underground

This indicator shows the volume of the direct connections between the different neighbourhoods. When several lines go through a location, they connect it directly to several neighbourhoods in the city. This is an indicator of “spatial” comfort [Lebrun, 2018]. The lengths of underground and tram networks (km-route and km-line) are proportionate to the length of service of each of the lines during the inaugural year, whereas the official figures for the situation on 31 December could suggest that they were in service for 12 months; this concerns in particular the global restructuring on 1 July 2007 and 2008 and the different extensions of the underground.

Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017)

Figure 3. Km-convoys (million km), tram, bus (including trolley bus) and underground

Figure 3. Km-convoys (million km), tram, bus (including trolley bus) and underground

The kilometric production reflects both network meshing and vehicle frequency. It involves the total number of kilometres covered in a year by all of the trams, buses and underground. The indicator increases when the network grows (creation or extension of lines) or when the average vehicle frequencies are improved. It could be considered more as an indicator of “time-based” comfort. The km-convoys include the kilometres covered by the sum of the different vehicles which make up a convoy (i.e. for trams, an engine with a trailer until 1975, and for the underground, all of the carriages in a train). As of 1995, neither the “empty km” connecting the line to the depot nor the special transports are counted.

Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017)

Figure 4. Spaces-km (billions with 6 spaces/m2), tram, bus (including trolley bus) and underground

Figure 4. Spaces-km (billions with 6 spaces/m2), tram, bus (including trolley bus) and underground

This indicator is linked to km-convoys and the size of vehicles. The size of vehicles varies in large proportions. Once again, this indicator is a global reflection of the service provided by each of the three modes, without any slight geographical or time differences. Instead, it is an indicator of “physical” comfort. The official statistics were the object of a methodological modification: as of 2005, the theoretical capacity of vehicles has been based on 4 people standing per m² instead of the previous 6. This has a different impact on trams, buses and the underground given that the proportion of standing room within the total number of spaces is not the same.

Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017)

Figure 5. Average frequency (minutes), tram, bus (including trolley bus) and underground

Figure 5. Average frequency (minutes), tram, bus (including trolley bus) and underground

This indicator gives an idea of the service via the average waiting time; it is different from the experience of passengers as it covers an extremely variable range of situations according to the different times (day, evening, weekend, school holidays, etc.) and neighbourhoods (differences between modes and according to the density of lines). These significant variations give an annual average which provides a relevant indication of the level of the service, knowing that the passenger satisfaction survey highlights the importance of frequency. This indicator is even more important when the journey includes one or more connections [Dobruszkes et al., 2011], even if the recent progress in terms of information has reduced the uncertainty related to waiting times. The average frequencies were calculated based on km-convoys, lengths of lines and 19 hours of service per day.

Source: calculations by the author based on Tramways Bruxellois (1950-1953) and STIB (1954-2017)

Figure 6. Number of passengers (millions), tram, bus (including trolley bus) and underground

Figure 6. Number of passengers (millions), tram, bus (including trolley bus) and underground

This indicator integrates the sales, survey estimates of journeys with passes and unpaid journeys (regular fraud, passengers in big crowds where almost nobody pays); it takes into account the tickets with special rates and variations in the categories of beneficiaries. For the method used to count passengers, see chapter 5 of the 2ème Cahier de l'Observatoire de la mobilité [Lebrun et al., 2013]. In 2010, a statistical correction concerning the distribution of passengers between modes was made using more precise data thanks to MOBIB ticket validation; trams and buses therefore gained passengers (31 % and 9 % respectively) to the detriment of the underground (-21,7 %).

Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017)

2. 1950-1970: the decline of the public transport service

2.1. After the war, a service based on trams

11In 1950, trams constituted most of the public transport service in Brussels: more than 800 engines covered 46 million km-convoys per year in a vast network of 500 km of lines, transporting 380 million people. However, the tram lines were soon replaced by bus lines. Their development was very rapid: in 1970, they covered a total of 272 km and transported 46 million passengers (27 % of the total), largely to the detriment of tram lines whose network was reduced by more than 200 km.

  • 1 From 1950 to 1970, territorial growth reached 11 % and there was a population increase of 100 000 i (...)
  • 2 Jean-Pierre Hirsch, honorary president of the Chamber of Commerce, cited by [Ministère des Communic (...)

12In 1955, two bus lines and the “Autobus Bruxellois” trolley bus line were added to the service. In parallel with the conversion of tram lines into bus lines, STIB introduced a request for eight new bus lines and ordered 60 vehicles to serve certain new neighbourhoods built mainly in the outer ring.1 The length of route in the STIB network increased considerably until 1963 (50 % increase between 1954 and 1963) followed by a slower increase. Between 1950 and 1970, the total length of the lines increased only slightly (by 7 %). The network therefore expanded geographically but decreased in terms of density, in particular in the central part of the city. Even though it is considered as “indispensable to urban prosperity”2 given that private means of transportation cannot be used for all journeys, the disinvestment in the tram was a reality.

13Overall, the quality of the service worsened during this period (with the exception of the efforts made for the 1958 World's Fair, the only true anticipated development): the average frequencies of the buses were far lower than those of the trams which they replaced (approximately a twelve- and eight-minute wait respectively). The service expressed in km-convoys (-36 %) and above all in spaces-km (-47 %) worsened steadily until 1970, despite the rapid expansion of the bus network. While the buses produced 1,3 billion spaces-km, the tram service was reduced to 4,2 billion spaces-km, i.e. a 65 % decrease. The decrease in the average frequencies was clear in this respect: the waiting time increased from one vehicle every six or seven minutes on average to one vehicle every twelve minutes.

  • 3 56,5 % for an average weekday according to the 1964 SOBEMAP study [Lombard, 1969]
  • 4 Citroën 2CV, Renault 4CV, VW Coccinelle, Fiat 500, etc.

14In Belgium and even more so in the big cities, most journeys at the time were made by public transport.3 But the rising standard of living, the decrease in the cost of fuel in inflation-adjusted francs, and the marketing of cheaper cars4 prompted more and more households to buy a car. Due to this evolution, those responsible were convinced that the future belonged to the car. The decisions were all pointed in the same direction: the public transport service was reduced in order to adapt to the demand, and in reality as a cost-saving measure, whereas impressive road infrastructures were built throughout the entire country and in Brussels in particular (tunnels in the inner ring, Leopold II viaduct, etc.). The first signs of road congestion alarmed those responsible, who decided to earmark significant resources to increasing road capacity in view of “making the Belgian road network one of the foremost in Europe” [Ministère des Travaux Publics, 1956: 1].

15All of this took place within the framework of a certain consensus: “the urban middle class belonged to the model of periurbanisation, car ownership and indifference towards – and even disregard for – urban public transport” [Vandermotten, 2014: 181]. Society is experiencing a true change in culture and practices involving a heightened use of cars: Americanisation of lifestyles, emergence of a “desire for cars” [Ansay, 1997], beginning of the middle class exodus towards the outskirts of Brussels via a disconnection between places of work and residence, and the reinvestment in higher speeds for greater distances.

16Having observed the same process in the United States, Jane Jacobs [1960: 360] had already recommended a “development of the public transport system in order to meet the increasing demand, and anticipate this demand, in the same way that the decline of this system was caused by a drop in demand and an anticipation of this drop”.

2.2. The unpopular tram and the global service in free fall

17The (car-owning) population as well as political decision-makers at the time had lost faith in trams: they blocked cars at stops, they were often blocked due to their rigid structure, they were difficult to access with their floors 90 cm off the ground, and they were an image of the past. Buses, on the other hand, were flexible, modern and above all cheaper to operate and invest in as they did not require their own infrastructure. They constituted the ideal means to serve the new neighbourhoods in the outer ring of Brussels where single-family dwellings were being built as well as “groups of high-rise blocks of luxury flats in co-ownership intended for the more or less well-off middle class” [Vandermotten, 2014: 168].

18The bus network also developed in parallel with the resumption of many tram lines. At the same time, many European cities were more radical, by simply removing their tram networks altogether. In Brussels, the reorganisation of the tram network is pronounced in the centre and the inner ring.

  • 5 The Parisian network was dismantled in 12 years from 1925 to 1937, that of La Rochelle disappeared (...)

19In “Le retour de la bicyclette”, Frédéric Hérant [2014: 50] provides a comparative explanation of the disappearance of trams in European countries. He noticed that this widespread disappearance in France5 and the United Kingdom – unlike Germany and Belgium for example – is related to several phenomena: “the tidal wave of cars everywhere constitutes the main explanation”, but it is not enough: France and the United Kingdom have a very liberal design of urban transport according to which operators are responsible for their own profitability and users must pay for the service. The modernisation investment is therefore reduced to a minimum, and buses are a much more profitable solution.

20The need for extensive service for Expo '58 also explains the preservation of a tram network in Brussels [Hubert, 2008]. In order to guarantee the accessibility of the Heysel site, a huge effort was made: separate lanes for trams in the large avenues and an increased service thanks to the purchase of one hundred trams from the 7000 series. But, the following year, there was a sharp decline in the service due to economic reasons.

21Despite Expo '58, the entire period between 1950 and 1970 was characterised by a significant reduction in the attractiveness of public transport, which was often crowded during rush hour. This led to a huge loss of close to 100 million passengers during both decades. During this period, there was a 46 % reduction in the spaces-km, whereas the population increased by 10 %, mainly in the outer ring. This significant reduction in the service took the inhabitants of Brussels by surprise: 1965 was characterised by a record occupancy rate in public transport vehicles (9,5 % more in trams than in 1950, when trams were already full) (figure 7). Passengers did not abandon trams as soon as there was a reduction in the service. The decision to decrease the service was therefore in all likelihood accelerated by car ownership by households and resulted in a decrease in the use of public transport, whose service was then adapted to meet the lower demand.

Figure 7. Occupancy rate (6 passengers/m2), tram, bus (including trolley bus) and underground

Figure 7. Occupancy rate (6 passengers/m2), tram, bus (including trolley bus) and underground

This represents the relationship between the annual number of passengers and the number of spaces-km, based on the hypothesis that the average journey is 4,4 km (based on a STRATEC survey for STIB) and that the capacity of vehicles remains constant (6 people standing per m2) in order to obtain homogeneous series.

Source: calculations by the author based on Tramways Bruxellois (1950-1953) and STIB (1954-2017)

2.3. An underground tramway to stop the loss of passengers

22At the beginning of the 1960s, there was a need to react. Studies and plans flourished [De Beule et al., 2017: 312]. In 1963, the ministry of communications published a study of “the problem of traffic congestion and the role of public transport in large urban areas” which, as it were, constituted a response to the vision which was very much centred on the road network, developed by the Ministère des Travaux Publics [1956] in two works: “Bruxelles, Carrefour de l’Occident” and “L’Aménagement routier de Bruxelles” (1959), publications which justified the major roadworks [Tellier, 2010: 3]. The two approaches were, however, based on the same observation: due to the increase in the number of journeys, the space in the streets was insufficient, and private transport – which, apart from the fact that it stole a share of the clientele from public transport – also hindered its operation considerably. And they led to the same conclusion: it was necessary to avoid the interference between public and private transport via a separation of levels. There would thus be a shift “from controversies to compromises” [Tellier 2010], leaving the surface to individual traffic, and even increasing the capacity: for example, the boulevards in the centre would have four lanes, whereas Rue de la Loi, with two-way traffic and trams, would have five lanes in the same direction for road traffic.

23At the time, the compromise consisted officially in promoting the creation of an underground tramway in the most congested parts of the city. The ministry of communications [1963: 42] considered that “the biggest concentrations of tram lines in the boulevards of the centre and the east inner ring do not exceed 10 000 spaces per hour”, which is too low considering the 25 to 50 000 spaces which could be provided by the underground. Thus, “rather than creating a metropolitan railway or a monorail, the creation of an underground tramway which would be limited to the areas where the general traffic reaches a critical level of congestion, appeared to be a solution which was more in keeping with the true needs in terms of traffic, and which would cut investment costs”. The report added: “The beginnings of the underground networks (…) could be transformed into a true metropolitan railway when all of the conditions which justify economically the application of this mode of transport are created”. But soon after the start of works in 1965, there was a call for a true underground. Public Works were in favour of a more radical solution: a true underground without further delay [Delmelle, 1986: 56]. This position was also backed by the representatives of Tramways Bruxellois who held the management positions at STIB [Laconte et al., 2016: 11].

24Using the arguments in its 1963 report, the ministry of communications [1969] aligned itself and published a brochure with a clear title: “Métro ? Oui !”. The underground would have to have 5 lines in 1984 (for 53 km of routes) and 92 stations. A much more ambitious outline for 2000 was included. The creation of an underground tramway therefore translated into a true underground considering the needs of commuters, who already held 32 % of jobs in Brussels in 1961. The first works were carried out where the offices and commercial concentrations were located (the city centre, the Louise/Porte de Namur section and the Léopold neighbourhood), sometimes jointly with big development activities such as the Berlaymont, the Tour Madou and the Philips-Grande-Poste ensemble at Place De Brouckère (figure 8).

Figure 8. Excerpt from brochure N°4 of the Brussels underground for De Brouckère station (1969)

Figure 8. Excerpt from brochure N°4 of the Brussels underground for De Brouckère station (1969)

Source: collection V. Carton

  • 6 Until 1989, Jos Chabert from Brussels – who had begun his political career in the outskirts of the (...)

25During these years and until the creation of the Brussels-Capital Region in 1989, the decisions in the area of road and underground infrastructures were taken by national ministers and not Brussels ministers,6 with no resistance from the municipalities which would have to endure these major works. Technical choices were made without necessarily considering the urbanistic impacts or the needs of users, captive for the most part.

26In order to calibrate the road and public transport infrastructures scientifically, the technicians made use of American traffic engineering methods [Lannoy, 2003]. One must be aware that the more the schematisation of networks necessary for modelling concentrates the flow of passengers on certain routes, the easier it is to justify high-volume infrastructures (viaducts, road tunnels or underground). An example is given by the simulation carried out for the SOBEMAP study in 1983: “with a scattered network of lines beginning at Rue du Progrès, the results were not in favour of the extension of the tunnels beyond the North Station”, contrary to the South Station-Albert branch [van den Hove, 2007: 26]. In this perspective, the network was restructured in 1967 by removing the small lines to the benefit of the two central routes (boulevards in the centre and the east/west route) in preparation for their move underground. It was the beginning of the shift from a meshed network towards a hierarchical network.

27To sum up, based on the triple observation of the loss of passengers, the decrease in network efficiency due to an increase in road traffic, and the deterioration of STIB accounts, the decision was taken to make large investments in the creation of an underground tram network, and thus make room on the surface for car traffic.

3. 1970-1975: the interlude

28The beginning of the 1970s was marked by the awareness of environmental challenges, pollution caused by car traffic and the energy question on the occasion of the first oil crisis in 1973. From then on, for the first time since the war and therefore after a long period of deterioration of the public transport service, it was improved over a few years: +14 % of km-convoys between 1970 and 1975 and almost the same service maintained until 1979. This result was obtained thanks to better frequencies in the tram and bus networks, as well as an extension of the latter. The number of spaces-km increased. To achieve this, the means were reinforced by the purchase of rolling stock and the massive recruitment of staff, whose numbers rose from 5 118 in 1970 to 5 769 in 1975 (and even 6 784 in 1981). This was made possible thanks to a (temporary) increase in the STIB allocation, although the very high inflation at the time (12,8 % in 1975) puts this into perspective.

29Amid this questioning of the future role of cars, there was unanimity regarding the realisation of the project for the underground: politicians, unions, associations and public opinion. This is testified by the fact that in 1972, in view of accelerating the works under the boulevards in the centre, the City of Brussels borrowed € 255 million (in inflation-adjusted francs, 2018) and the Greater Brussels Council attempted to do the same, before it was blocked by its administrative power.

30This reinforcement of the service soon coincided with an increase in the number of passengers. The fares were part of the explanation: they were slightly raised at a time when inflation was high, which means that in inflation-adjusted francs, they decreased by 41 % between 1970 and 1975 [Thiry, 1988: 64]. Due to inertia in the system, this increase was observed for three more years despite the deterioration in the frequency of trams and buses and even that of the new underground, but at the cost of a 15 % increase in the average occupancy rate (figure 7). The individual choices of travel mode did not change overnight.

4. From 1976 to 1989, austerity and controversy with respect to the underground

4.1. Contrasted evolution of the service for 13 years

  • 7 And 27 % for the surface network alone.
  • 8 Source: Greater Brussels Area, internal report.

31With the implementation of the underground on 20 September 1976, the network configuration and the nature of the service evolved. The common core of the east-west route operated via underground was replaced by longer tram lines which went through as a prémétro, causing a change towards a more hierarchical network and operating as feeders in the direction of underground stations. Two indicators increased during these 13 years: the length of the route increased by 15 % (33 km of underground and 57 km of buses greatly compensated for the 22 km loss for the tramway, but not the removal of 94 km of tram lines) and the number of spaces-km increased by 25 %, mainly thanks to the large capacity of underground trains which allowed an improvement in productivity. However, in order to reduce operational costs, the average frequencies were decreased by 26 % during this period and the km-convoys by 19 %,7 reaching their historical low of 33 million (compared to 45 million in 2017) from 1983 to 1989. This drop in frequencies was sudden: for example, from the winter of 1979-80 and the spring of 1981, surface network frequencies decreased by 28,3 % (32,6 % for trams and 27,7 % for buses).8 Soon after its inauguration, the underground was also a victim of economies: the average interval between two trains was almost doubled.

32This contrasted evolution after the implementation of the underground service corresponded to a concentration in the global service: more spaces-km but longer waiting time and additional connections. In other words, the upturn at the beginning of the 1970s was followed by a significant transformation of the service. In addition, the increase in the number of passengers during the 1970s levelled out. The number of passengers decreased again in 1980 when the km-convoys for buses were also starting to decrease. This highlights the fact that underground public transport and the operation of underground trains were not enough to make up for the decrease in the number of passengers. High frequencies throughout the entire network is a determining factor.

4.2. The budget restrictions at the end of the 1970s and the 1980s

33At the head of the ministry of communications from 1974 to 1980, Minister Chabert imposed a reduction of the operating deficit (reorganisation, increased fares, etc.). Contrary to the preceding period, the fares increased more than inflation beginning in 1976, and in 1975, the credit for covering the operating deficit was capped [Thiry, 1988: 44].

  • 9 For 1981 as well, the rate of coverage was 36 % in Antwerp, 41 % in Liège, 43 % in Ghent and 33 % i (...)

34Even if the wearing away of the tram network was ongoing (among others during the conversions of the prémétro into an underground), these economies – reinforced in 1982 – caused a decrease in the service as a whole beginning in 1978, for more than 10 years: the budgets earmarked for the operation of public transport were reduced for the entire country. The liberal/social Christian government in 1981 implemented stricter austerity measures. Despite the new underground, there was another decline in the number of passengers which, from 1986 to 1989, reached the historic low seen at the beginning of the 1970s. The remedy for this did not have the expected results, but no one spoke of it. In 1982, Minister Herman De Croo implemented royal decrees for the improvement in the rate of coverage of operating costs through traffic revenue which was 28,4 % at the time.9 In concrete terms, this decision led to hiring freezes, reduced maintenance, a delay in the purchase of buses, an increase in fares, etc. The proposal to reduce the network drastically after 8 pm was soon abandoned following the fierce protests of associations of users. Between 1981 and 1990, STIB lost one quarter of its staff. The budget policy prevailed over mobility challenges, even if, thanks to the increase in productivity, the service was not reduced in the same proportions: the number of km-convoys produced per employee increased by 16 % between 1981 and 1986, but given the drop in use, the number of passengers transported did not change and the occupancy rate of vehicles dropped by 20,6 % [Thiry, 1988: 68].

4.3. New stakeholders open the debate on the underground

35Created in 1973, the Greater Brussels Council resumed the rightful place of the municipalities in the managing bodies of STIB. In its search for legitimacy, it promoted a more Brussels-based approach advocated among others by deputy burgomaster Serge Moureaux. In the 1980s, he began to question the national policies centred on commuting and the development of heavy and traumatising road and public transport infrastructures. The options were debated: round tables, public surveys, etc. [Schoonbrodt, 2007: 187]. In order to defend its position, the Greater Council organised an international conference on “The Future of Urban Transport” [Greater Brussels Council, 1985] and published several studies [Carton et al., 1986 and Carton, 1986] (figure 9).

Figure 9. Coverage of the proceedings from the conference “The Future of Urban Transport” organised by the Greater Brussels Council (1985)

Figure 9. Coverage of the proceedings from the conference “The Future of Urban Transport” organised by the Greater Brussels Council (1985)

Source: collection V. Carton, illustration: François Schuiten

36Other stakeholders which were increasingly present in the debate on the city were the citizen groups (neighbourhood or theme-based) such as ARAU, Ligue des Familles and the federations Inter-Environnement-Bruxelles (IEB) and Brusselse Raad voor het Leefmilieu (BRAL). The threats to the public transport service prompted them to unite in 1980 in the creation of Rassemblement pour une Autre Politique de Déplacement (RAPD). It was opposed to the light rail project promoted by some and to the withdrawal of tram lines (58 and 62, for example). ARAU [1980] organised its annual Ecole Urbaine on the promotion of a high-frequency meshed network in opposition to the hierarchical and concentrated network promoted by STIB and the Minister.

37This period therefore saw a renewal of discussions regarding the choices in terms of short-term (operation) and long-term (infrastructures) service.

38For his part, with his drastic approach to the operating budget, the Minister had no problem undertaking significant investment expenditure (via loans) in order to continue the extension of the underground network and reduce the surface network. His objective was to improve the rate of coverage of costs through revenue; with the increase in productivity, this rate increased from 28,4 to 32 % in 1986, but of course did not take into consideration the depreciation of investments.

39At the Minister’s request, in 1983 SOBEMAP studied restructuring scenarios for the STIB network focusing more on the development of the underground and buses and reducing the tram network to a minimum, as it was considered to be the most expensive. The “neighbourhood” trams such as lines 81 (through Saint-Gilles), 93 (Place Brugmann) and 22 (Porte de Namur) were targeted. However, due to their location, their clientele were not influenced by rush hour and therefore they had a global occupancy rate which was higher despite the traffic difficulties they encountered.

40This approach and the abovementioned royal decrees brought together the Secretary of State of the Brussels-Capital Region, the Conference of Bourgomasters, the Greater Brussels Council and the citizen groups. For them, the tram network also had to be developed and priority had to be given to the improvement of the commercial speed of trams and buses, a policy referred to as VICOM, which is now called AVANTI.

  • 10 The inner ring was only completed 21 years later (West Station-Delacroix).
  • 11 The terminuses of these direct lines were located in Groot Bijgaarden, Erasme, St Denis, South Stat (...)
  • 12 For example, giving up the East-West bis underground, prémétro under the Louise bottleneck and Rue (...)

41The 1970s unanimity in favour of the underground was broken. This strong mobilisation did not prevent the major change in terms of the service on 2 October 1988 with the conversion of the prémétro in the eastern part of the inner ring into heavy rail,10 thus removing many direct connections made with six tram lines between the “upper city” and many neighbourhoods.11 A 7 km underground line from the South Station to Simonis replaced these six lines which each covered an average distance of 11,6 km, involving many additional connections [see Dobruszkes et al., 2011 regarding the arduousness represented by this]. These debates and the scarcity of financial means led to certain projects being given up12 and to a spacing out of worksites over time.

5. The 1990s: the Brussels-Capital Region makes its choices

5.1. The new Region promotes the surface network

  • 13 Nine years after the Walloon and Flemish Regions, Brussels became a full region and obtained legisl (...)
  • 14 Cooperation agreement of 1993 between the state and the Region stipulating yearly financing of 125  (...)
  • 15 This measure was intended to move the STIB expertise in infrastructures to the regional administrat (...)
  • 16 The following four management contracts were adopted in 1996, 2001, 2007 and 2013.

42When the Brussels-Capital Region was created in 1989,13 the inhabitants of Brussels had the power to decide on the future of their transport, but in a limited budgetary context and alongside a federal state in charge of the RER and, a little while later, Beliris.14 The Region became the organising authority for STIB, took over for the Greater Brussels Council within STIB and, at the initiative of Minister Jean-Louis Thys, launched a reorientation of the mobility policy: elaboration of a mobility plan (IRIS plan), withdrawal of the STIB Service Spécial d’Etude,15 and adoption of the first management contract with the transport operator in 1991.16 Through this contract, the Region committed itself to earmarking a guaranteed allocation to STIB which had to ensure a determined level of transport service. The Region also began a gradual reorganisation of public spaces in favour of active modes and public transport [Brandeleer et al., 2016]. Of course, this evolution has been slow and is far from over.

43Aware of the fundamental challenge of an alternative to cars in a context of a steady increase in traffic, the Region decided to boost the STIB service, beginning with the most flexible mode – the bus – whose service had decreased by 18 % from 1979 to 1986. At this time, the tram network was no longer considered as a network waiting to be replaced by the underground, with the exception of the lines located in the area of influence of the future underground. On the contrary, a line was soon restored (Rue de Stalle in 1991), another was extended (the 55 to Bordet in 1993), the rolling stock was renewed (the 2000 series trams: first trams with a low floor in Brussels) and the underground works which were ending allowed a 2 km extension (Bizet and Clémenceau). For the first time since 1950, the rail network was not reduced. Even if the infrastructure policy did not break with the past completely given the worksites and the weight of technical bodies [Tellier et al., 2013], it nevertheless constituted the beginning of a true change in terms of the allocation of available means, which had decreased significantly following the regionalisation. Overall, the public transport service was beginning to improve. For the first time in 1990, the tram won back some passengers, in parallel with the underground and the bus.

5.2. 1995, a mixed political reorientation

44As part of the governmental declaration of 1989, the extension of the underground to “Erasme” university hospital illustrated the desire to reach the development poles on the outskirts, but without any anticipation, as the decision for the establishment at this location dated back to 1969. For ULB, this extension “was an obvious fact, just like the underground to the Louvain-en-Woluwe site, which was inaugurated in 1982” [Telex 1992]. The studies were begun in 1990, but it was not until the arrival in the government in 1995 of Minister Hervé Hasquin, former chancellor and chairman of the board at ULB, that the project was launched and ended with its inauguration on 15 September 2003. As the budgets were not huge, the Minister was able to impose the pertinent choice to build the line economically (not very deep and single central platform).

  • 17 The figures show a decrease in production in 1995. This was due to the exclusion of “empty” km to t (...)

45After an excellent annual increase of 2,1 % of km-convoys covered between 1989 and 1994, there was a return to a low increase of 0,4 % between 199517 and 2005. During this entire period, the frequencies of trams and buses stagnated: the average frequency was close to 17 minutes for buses and 14 minutes for trams, i.e. twice that of the 1950s. Only the underground frequencies had improved slightly. Network use slowed down (-2 % from 1995 to 1999), but remained at a high level.

6. The 2000s: almost double the level of service

6.1. Rapidly evolving context and mobility

  • 18 Brussels nevertheless continues to lose nearly 10 000 inhabitants per year to the other two Regions (...)

46Brussels has been changing: there has been a trend reversal in terms of population, with an increase of 232 000 inhabitants from 2000 to 2017;18 the number of jobs, just under 50 % of which are held by commuters, increased by 92 000 between 2002 and 2016, as well as the number of students. Compared to 1950, employment in 2016 increased by 58 %, the population by 24 % and STIB clientele by 5 % (figure 10).

Figure 10. Employment, population, number of passengers (index 1950=100)

Figure 10. Employment, population, number of passengers (index 1950=100)

These three data are presented based on a level 100 in 1950.

Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017), IBSA

47The population has become more dualised and has continued to become poorer on average, the size of households is decreasing, young people are less interested in car ownership, and the population increase is due to immigration from poor countries as well as to international executives and civil servants, with or without their families [Vandermotten, 2014: 87]. These factors have contributed to the decrease in the rate of car ownership. Positive changes in behaviour and mobility policy have also been observed: telework, increased use of bicycles, car and bicycle sharing services, applications dedicated to mobility, etc. However, taxation in favour of company cars and widespread availability of parking spaces at work point in the opposite direction. Despite its two IRIS travel plans (1998 and 2010), the Region has struggled to reach its objectives to reduce car traffic. It has counted on STIB in particular to do so and has granted it an operating allocation which has increased significantly since 2011.

48At STIB, in 2000, for the first time in its history, the management was no longer in the hands of an engineer, but in those of a lawyer from the private sector, Alain Flausch. Another approach was developed concerning management, company image, information and contact with the clientele (formerly “the users”), among others, free travel for children under age 12 and people over age 65 (the latter withdrawn in 2013) and the major progress made recently in the area of information for passengers (displays at stops, STIB Mobile application, announcement of incidents, etc.). In addition to this, several underground stations have been renovated (figure 11).

Figure 11. The renovated Schuman station provides new comfort to passengers

Figure 11. The renovated Schuman station provides new comfort to passengers

Source: photo V. Carton, 2018

  • 19 In 2000, the number of passengers was adjusted downwards following the observation after the survey (...)
  • 20 The occupancy rate is calculated here based on 6 people standing/m2 in order to allow a comparison, (...)

49Although the service evolved more qualitatively than quantitatively over a few years, this new management as well as several external factors initiated a period of strong increase in the use of the network.19 Among these external factors, Christophe Goethals [2012] mentions “the population increase, the parking policy, the increase in the cost of fuel, the increase in congestion, economic growth and the growing awareness of the population with respect to environmental challenges”. In addition to these economic reasons, there has also been the structural trend involving an increase in mobility in general (2 % per year in Belgium since 1960). The use of the network has increased faster than the service. This has resulted in an increased occupancy rate of vehicles and a growing lack of comfort: there was an average increase from 10,5 % to 14,7 % between 2000 and 2006, i.e. a 40 % increase.20 This increase was unequal: 67 % for buses, 44 % for trams and 25 % for the underground. During rush hour, the situation is acute: there is an urgent need to increase the service.

6.2. Rapid increase of the service as of 2005

  • 21 From 2005 to 2017, the number of spaces in trams increased from 41 675 to 71 511 and in the undergr (...)
  • 22 There was a 67 % increase for the underground and a 46 % increase for the bus (4 people per m2).

50In order to have more spaces-km, the kilometric production was increased via frequencies, and bigger vehicles were used. As the frequencies of the underground had always been high, the improvement was centred on the frequencies of the surface network: from 2004 to 2017, the average frequency of trams went from 14 to 9,4 minutes, and that of buses from 17,6 to 13,4 minutes. Furthermore, the gradual introduction of large-capacity trams (150 vehicles from the T3000 series and 70 from the T4000 series), 162 articulated buses and 21 BOA underground trains allowed an increase in the unit capacity of convoys, as well as a 72 % increase in the capacity of trams and a 52 % increase in the capacity of the underground21 (figure 12). The network evolved as well: following the extension of the underground to Erasme in 2003, the inner ring line was completed in 2009, and tram lines were created or extended (Quai des Usines in 2005, Boulevard du Souverain in 2006 and 2011, Boulevard Léopold III in 2012, etc.). The result was that between 2000 and 2017, the network spanned 52 km. Better frequencies, extended network and bigger vehicles provided 71 % more spaces-km in 12 years and even doubled this service for trams.22

Figure 12. The 3000 and 4000 series trams increased the capacity of the vehicle fleet

Figure 12. The 3000 and 4000 series trams increased the capacity of the vehicle fleet

Source: photo V. Carton, 2018

  • 23 CHRONO is the new label given by STIB to its fastest lines. It guarantees quality service, close to (...)

51At the same time, the 2008 tram-bus master plan created shorter surface lines, favourable to operations but creating more connections for passengers. The 2008 plan also created “CHRONO” 23 tram lines (lines 3, 4 and 7) in fully separate lanes on a 34 km route with frequencies equal to those of the underground. This “high-level” tram service was a huge success and highlighted the challenge represented by measures favouring commercial speed.

52All of these actions allowed STIB to more than double its number of passengers (+136 % in 17 years). But it is surprising that the occupancy rate of vehicles continues to increase: situated on average at 10,5 % in 2000, this rate increased to 14,7 % in 2006. After a statistical correction in 2010 concerning the distribution of passengers between trams and the underground, the difference between modes is considerable: 19,8 % for trams, 15,5 % for buses and 8,6 % for the underground. These numbers and the high frequencies partly explain the appeal of the underground (figure 7).

53During the past five years, the increase in the service has allowed a return to better levels of comfort on average. However, this does not mean that problems no longer exist during rush hour and in certain sections. In total, the number of passengers in 1950 has been reached and even exceeded in absolute numbers, as the average occupancy rate at the time was higher than 25 %, which corresponded to a true lack of comfort. The illustrations of passengers standing on the steps of trams at this time are striking. It should be noted that the average rate includes the off-peak hours in the evenings and on Sundays.

54The three modes contribute to this new service, but not in the same way: by focusing only on the evolution between 2010 and 2017 in order to use the same counting method, there was a 40 % increase in the use of trams, 28 % for the underground and 15 % for buses. As of 2000, there was a rebalancing between trams, buses and the underground. STIB had become aware of the need to develop an integrated network based on the three modes by improving efficiency via the CHRONO lines and by reducing density via vehicles with a greater capacity.

7. The future service under discussion

55There are plans to continue reinforcing the service in the years to come. The decision was taken to reorganise the bus network and deliveries of electric and electric-diesel (hybrid) rolling stock will replace part of the fleet. The tram network will be extended in the west with the new line 9 beyond VUB university hospital in Jette until Heysel, and in the east with the 94 up to the Roodebeek underground. An underground passage is being considered for Place Meiser. Sixty trams will be delivered as of 2020. As regards the underground, in addition to a delivery of 43 trains as of 2020, there are plans for a driverless line from Albert to Bordet in 2028, as well as the renewal of the signals for lines 1 and 5 in view of their automation and the reinforcement of frequencies along this route. An investment of approximately 5 billion euros over 10 years has been announced. This is nevertheless typical of the lack of anticipation often seen in Brussels, where sites such as Tour & Taxis and the new Tivoli ensemble in Laeken remain forgotten, while the urban densification of the surroundings of the West Station have been delayed.

56While the principle of reinforcing the service is not controversial, the underground conversion of the north-south route (Albert-Bordet or Underground 3) for close to 2 billion euros has opened a debate similar to the one which took place in the 1980s concerning the underground conversion of the east inner ring: it involves the replacement of several prémétro lines (3, 4, 51) with a central high-capacity section fed by connections with the ends of the split tram lines. Aware of the ordeal caused by the major open trench works, the technicians remembered the request by committees in Saint-Gilles to make the underground using a tunnel boring machine. This option for very deep works was accepted quickly by the political decision-makers, exempt from having to take measures to limit the space for cars, which were necessary for the smooth operation of tram line 55. In addition, there was the illusion of an invisible worksite.

57Another approach entitled Cityvision [Lebrun et al., 2009] was developed. It received the support of citizen groups and unions, but did not interest the political world. It was based on the principle of a surface network operated as a prémétro in the existing works.

58In her analysis of public action, Elodie Goffinet came to the conclusion that the rationale for the prémétro in the 1960s was the same as that for the Underground 3: “The common conceptions which resulted from this (avoid interference between public and private transport; the underground belongs to public transport and it is not conceivable to have roads without private vehicles) have persisted, and are evident in the current decision concerning the Underground 3. The project is seen as a solution as it is separated from friction on the surface”. She added that “another vision of mobility in Brussels and the implementation of alternatives would therefore cost too much politically for politicians” [Goffinet, 2018: 16].

59Currently, several positions are advocated by the citizen groups which are part of the debate: some of them contest the encroachment on quality green space (Square Riga), others do not want a connection with the centre (ACQU in Uccle), others support the improvement of tram line 55 instead of an underground located at a depth of almost 30 m (“mobi55”), and others contest the project as a whole and advocate the reinforcement of the surface service in Schaerbeek and Evere, even if it means taking space away from cars (ARAU, IEB, BRAL, etc.).

60The future structure of the network and the allocation of 40 % of the investment budget, either for a major project in the medium term (2028 at the earliest), or for the extension and gradual improvement of the entire network, are therefore at stake.

Conclusions

  • 24 Calculated with a constant theoretical capacity of 6 spaces/m² in order to allow a comparison; the (...)

61Since the creation of the Brussels-Capital Region, the service in terms of spaces-km has been revived (+150 % 24 in 28 years). The increase has even been spectacular since 2011. The use of the network follows. This policy highlights the challenge of a vast meshed network with high frequencies, whose capacity is adapted to the demand, the only approach which is able to gain favour with the inhabitants of Brussels, despite poor performance in the area of the commercial speed of one part of the surface network [Courtois and Dobruszkes, 2008]. The decrease in the commercial speed and irregularity are the result of the regional and municipal decision makers' fear to take measures to limit the number of cars in the public space. Fifty years after its inauguration, the underground accounts for less than 10 % of the length of the network, and due to its strategic location and thanks to the feeding by trams and buses, it transports more than one third of passengers. But it is mainly the overall increase in frequencies which has caused the use of public transport to double over the past 15 years, fuelled in particular by the population boom and the increase in the number of working-class Brussels households with a low level of car ownership. The spectacular rise in the number of annual journeys per inhabitant (figure 13) is evidence of this change, even if the score of 337 is still far from that of cities such as Zurich, which greatly exceeds the score of 500 obtained with a surface network of trams, trolley buses and buses. In contrast, the bus network of the urban community of Dunkirk, for example, scarcely obtains 80 journeys per year per inhabitant.

Figure 13. Number of journeys per inhabitant per year

Figure 13. Number of journeys per inhabitant per year

This involves the relationship between the number of journeys made per year in the network and the number of inhabitants in the urban area (19 municipalities), providing an indicator of the rate of use of STIB by the inhabitants of Brussels, even if certain journeys are made by commuters and visitors, and if certain STIB lines go beyond the regional boundaries, whereas the operators in the other two Regions provide service in Brussels.

Source: calculations by the author based on Tramways Bruxellois (1950-1953) and STIB (1954-2017)

62The three moments when the network service was reinforced overall (from 1972 to 1977, from 1988 to 1993, and in particular from 2001 to 2017) were the only times when the number of passengers increased. The period during which there was a significant increase in the underground network (1978-1989) did not correspond to an increase in STIB clientele – on the contrary (-10 %) – and it was also the period with the most significant decrease in km-convoys (-18 %). One of the conclusions of our analysis is therefore that it is not enough to invest most of the means in one single mode – in particular if its territorial coverage is limited – in order to attract new clientele.

63Currently, and paradoxically, while the high increase in the number of passengers may be accommodated thanks to a true improvement in network frequencies and even more so of the surface network, some people are persuaded that the 5 km of the north underground planned for 2028 at the earliest is a key element in “saving” mobility in Brussels. This opinion is in keeping with the statement made to Le Soir by Hervé Hasquin on 9 August 1995: “If we want to solve the traffic problem in Brussels we must finish the underground network.”

  • 25 In addition to the 31 stations in Brussels, 15 stations are being considered in the different studi (...)

64The challenges to be met are complex given the scattering of the habitat, the availability of parking in the employment areas, the low revenue from the use of individual transport and an advantageous fiscal policy for cars. All of this makes the modal transfer policies uncertain, including those in favour of the future RER. Bicycles are gradually becoming more important in the area of mobility and, within certain limits, car sharing allows a reduction in space requirements for private transport. Part of the increase in the mobility demand may be met by these. But for the rest, in the short term, this increase cannot be dealt with by private cars in the congested roads during rush hours, or by the trams and buses in the roads which face traffic constraints and operate at full capacity, or by the underground, whose extension is taking a huge amount of time (6 kilometres in the past 20 years) and is expensive (150 to 200 million euros per kilometre). In the medium term, along with better urban service possible thanks to 46 stations in Brussels,25 a meshed network, with exclusive lanes, could meet the growing demand in a city with the density of Brussels. The development of high-capacity infrastructures (5 000 to 25 000 passengers/hour/direction) could only be justified if it was not possible to operate this meshed network. This involves finding a balance between public transport and individual transport, collective interest and private interest, and even between general interest and local interest [Dobruszkes and Fourneau, 2007]. The challenges are not only mobility challenges: air quality, noise level, security and, more generally, the quality of life in the city in a calm atmosphere have become essential today.

The author would like to thank Benjamin Wayens, Michel Hubert, Marie Nagy, Isabelle Pauthier, Thierry Duquenne and Yves Fourneau for their wise advice.

Haut de page

Bibliographie

ANSAY, Pierre, 1997. Le désir automobile. Brussels: CFC Editions.

ARAU, Atelier de Recherche et d’Action Urbaines, 1980. Pour une nouvelle politique de la circulation à Bruxelles, des petits trams partout et tout le temps.

BRANDELEER, Céline, ERMANS, Thomas, HUBERT, Michel, JANSSENS, Isabelle, LANNOY, Pierre, LOIR, Christophe and VANDERSTRAETEN, Pierre, 2016. Le partage de l’espace public en Région de Bruxelles-Capitale. In: Cahier de l’Observatoire de la Mobilité. No 5. Brussels: Bruxelles Mobilité.

BRESSON, Georges, 2004. Economic and structural determinants of the demand for public transport: an analysis on a panel of French urban areas using shrinkage estimators. In: Transportation Research. Policy and practice. Vol 8, No 4, pp. 249-328.

CARTON, Vincent, DEWINT, André and VANDEMAELE, Paul, 1986. Quels transports en commun pour Bruxelles ? Brussels: Greater Brussels Council.

CARTON, Vincent, 1986. Modèle de simulation d’un réseau de transport urbain – application à Bruxelles. In: Revue TEC, No 77. 07-08/1986. pp. 17-21.

COURTOIS, Xavier and DOBRUSZKES, Frédéric, 2008. The (in)efficiency of trams and buses in Brussels: a fine geographical analysis. In: Brussels Studies. 27/06/2008. No 20. Available from: https://journals.openedition.org/brussels/608

DE BEULE, Michel et al., 2017. Bruxelles, histoire de planifier? Liège: Mardaga.

DELMELLE, Joseph, 1986. Le métro de Bruxelles. In: Brabant Tourisme. 09/1986. pp. 54-64.

DELEPIERRE-DRAMAIS, Christiane, 1990. Situations comparatives du transport en commun en surface et de métro à Bruxelles. In: Les dossiers bruxellois. No 15.

DE WITTE, Astrid, HOLLEVOET, Joachim, HUBERT, Michel, DOBRUSZKES, Frédéric and MACHARIS, Cathy, 2013, Linking modal choice to motility: a comprehensive review. In: Transportation Research Part A: Policy and practice. Vol. 49, pp. 329-341.

DOBRUSZKES, Frédéric, FOURNEAU, Yves, 2007. The direct cost and geography of Brussels mass transport’s operating delays. In: Brussels Studies. 24/05/2007. No 7. Available from: https://journals.openedition.org/brussels/423

DOBRUSZKES, Frédéric, HUBERT, Michel, LAPORTE, François and VEIDERS, Caroline, 2011. Réorganisation d’un réseau de transport collectif urbain, ruptures de charges et mobilités éprouvantes à Bruxelles. In: Articulo. Journal of Urban Research. Vol. 7, pp 1-15. Available from: https://journals.openedition.org/articulo/1844

GOETHALS, Christophe, 2012. Les enjeux du financement des transports en commun à Bruxelles. In: Les analyses du CRISP online. 20/12/2012. Available from: http://www.crisp.be/2012/12/les-enjeux-du-financement-des-transports-en-commun-à-bruxelles/

GOFFINET, Elodie, 2018. Le métro 3 : une dépendance au sentier tracé par le prémétro en matière de mobilité à Bruxelles. Final Assignment in Analyse de l’action publique. Brussels: Université Saint-Louis – Bruxelles.

GREATER BRUSSELS COUNCIL, 1985. The Future of urban Transport. Proceedings from the international symposium. Bruxelles. 21-22/05/1985.

HERAN, Frédéric, 2014. Le retour de la bicyclette. Une histoire des déplacements urbains en Europe, de 1817 à 2050. Paris: Editions La Découverte.

HUBERT, Michel, 2008. Expo ’58 and “the car as king” What future for Brussels’s major urban road infrastructure? In: Brussels Studies. 20/10/2008. No 22. Available from: https://journals.openedition.org/brussels/627

JACOBS, Jane, 1961 (French edition 1991). Déclin et survie des grandes villes américaines. Liège: Mardaga.

KAUFMANN, Vincent, 2003. Pratiques modales des déplacements de personnes en milieu urbain : des rationalités d’usage à la cohérence de l’action publique. In: Revue d’Economie Régionale et Urbaine. 02/2003. Vol. 1, pp. 39-58.

LACONTE, Pierre and VAN DEN HOVE, Claude, 2016. Le rail, clé de la mobilité. Bruxelles: Editions Aliter.

LANNOY, Pierre, 2003, L’automobile comme objet de recherche, Chicago, 1915-1940. In: Revue française de sociologie. Vol. 44, no 3, pp. 497-529.

LEBRUN, Kevin and DOBRUSZKES, Frédéric 2012. New RER stations for Brussels? Challenges, methods and constraints. In: Brussels Studies. 09/01/2012. No 56. Available from: https://journals.openedition.org/brussels/1076

LEBRUN, Kevin, HUBERT, Michel, HUYNEN, Philippe, DE WITTE, Astrid and MACHARIS, Cathy, 2013. Les pratiques de déplacement à Bruxelles. In: Cahiers de l’Observatoire de la Mobilité, No 2. Brussels: Bruxelles Mobilité.

LEBRUN, Kevin, 2018. Travel time by public transport in Brussels: the accessibility of poles of activity. In: Brussels Studies. 07/05/2018. No 123. Available from: https://journals.openedition.org/brussels/1661

LEBRUN, Luc, HUBERT, Michel and CARTON, Vincent, 2009. La Cityvision, ou comment faire beaucoup mieux que la Métrovision avec moins de moyens. Available from: http://www.ieb.be/La-Cityvision-ou-comment-faire

LOMBARD, Aril, 1969, Le métro de Bruxelles, Conception générale et procédés d’exécution. CERES thesis. Liège: Université de Liège.

MAUFROY, William et al., 2017. A pied, à cheval ou en voiture ? Exhibition. 16/09/2017 – 28/10/2017. Dunkerque: Centre de la Mémoire Urbaine d’Agglomération, Archives de Dunkerque.

MINISTÈRE DES COMMUNICATIONS, 1963, Le problème de l’encombrement du trafic et le rôle des transports en commun dans les grandes agglomérations. Administration des Transports.

MINISTÈRE DES COMMUNICATIONS, 1969. Métro ? Oui ! Administration des Transports, 3rd edition.

MINISTÈRE DES TRAVAUX PUBLICS ET DE LA RECONSTRUCTION, 1956. Bruxelles Carrefour de l’Occident.

SCHOONBRODT, René, 2007. Vouloir et dire la ville, ARAU. Brussels: AAM Editions.

TELEX, 1992. Le métro et les transports publics vers le campus Erasme. In: Magazine de l’ULB-UAE. 01/1992. No 73.

TELLIER, Céline, 2010, Des controverses aux compromis. Les lignes de front du métro bruxellois. In: Belgeo. Revue belge de géographie. Vol. 1-2. Available from: http://belgeo.revues.org/6796

TELLIER, Céline and ZITOUNI, Benedikte, 2013. How the technical bodies build the city. In: Brussels Studies. 04/02/2013. No 64. Available from: https://journals.openedition.org/brussels/1128

THIRY, Bernard, 1988. Evolution institutionnelle et description de l’activité des sociétés belges de transports urbains. In: La performance économique des sociétés belges de transports urbains. Working paper. Liège: CIRIEC, pp 41-80.

VANCO, Florian, 2013. Quels indicateurs de suivi de l’efficience des services de transports ? Focus sur les agglomérations de 100 à 250 000 habitants - Situation 2011. Paris: CERTU.

VAN DEN HOVE, Claude, 2007. Futures étapes des transports urbains, Schaerbeek et la desserte Nord et Nord-Est de la Région. 21/06/2007. Bruxelles: Commission Régionale de la Mobilité.

VANDERMOTTEN, Christian, 2014. Bruxelles, une lecture de la ville. Bruxelles: Editions de l’ULB.

Haut de page

Notes

1 From 1950 to 1970, territorial growth reached 11 % and there was a population increase of 100 000 inhabitants.

2 Jean-Pierre Hirsch, honorary president of the Chamber of Commerce, cited by [Ministère des Communications, 1963: 39].

3 56,5 % for an average weekday according to the 1964 SOBEMAP study [Lombard, 1969]

4 Citroën 2CV, Renault 4CV, VW Coccinelle, Fiat 500, etc.

5 The Parisian network was dismantled in 12 years from 1925 to 1937, that of La Rochelle disappeared in 1931 and the major networks outside the Paris area were removed between 1950 and 1964. In Dunkirk, the first bus line was operated in 1931 and the tram network which was damaged during World War II was removed in 1952 [Maufroy et al., 2017].

6 Until 1989, Jos Chabert from Brussels – who had begun his political career in the outskirts of the city (Meise) – was the only one to hold the post of communications minister for a few years (and of public works minister for 8 months).

7 And 27 % for the surface network alone.

8 Source: Greater Brussels Area, internal report.

9 For 1981 as well, the rate of coverage was 36 % in Antwerp, 41 % in Liège, 43 % in Ghent and 33 % in Charleroi.

10 The inner ring was only completed 21 years later (West Station-Delacroix).

11 The terminuses of these direct lines were located in Groot Bijgaarden, Erasme, St Denis, South Station, Fort Jaco, Wiener, Houba de Strooper, Heysel.

12 For example, giving up the East-West bis underground, prémétro under the Louise bottleneck and Rue Royale, as well as under Bois de la Cambre, which were all included in the 1979 Plan de Secteur.

13 Nine years after the Walloon and Flemish Regions, Brussels became a full region and obtained legislative authority, executive authority and its own administration.

14 Cooperation agreement of 1993 between the state and the Region stipulating yearly financing of 125 million euros for investments related to the role of capital.

15 This measure was intended to move the STIB expertise in infrastructures to the regional administration, and was delayed until a few years later.

16 The following four management contracts were adopted in 1996, 2001, 2007 and 2013.

17 The figures show a decrease in production in 1995. This was due to the exclusion of “empty” km to the depots and the special transports as of this date. This change also had the effect of breaking down the calculation of average frequencies.

18 Brussels nevertheless continues to lose nearly 10 000 inhabitants per year to the other two Regions, but beginning in 2000, a natural positive balance and positive balance of exchanges with foreign countries have compensated greatly for the departure of a proportion of the Brussels middle class.

19 In 2000, the number of passengers was adjusted downwards following the observation after the survey of an over-estimation of the number of journeys counted per pass.

20 The occupancy rate is calculated here based on 6 people standing/m2 in order to allow a comparison, although as of 2005, the statistics were based on 4 people. Let us also point out that the occupancy rate used here is an average which includes the off-peak hours.

21 From 2005 to 2017, the number of spaces in trams increased from 41 675 to 71 511 and in the underground, from 30 025 to 45 775 (standard of 4 people standing per m2).

22 There was a 67 % increase for the underground and a 46 % increase for the bus (4 people per m2).

23 CHRONO is the new label given by STIB to its fastest lines. It guarantees quality service, close to that of the underground, and is characterised by “separate lanes, quick service, high frequencies, excellent punctuality and new spacious vehicles with a high level of comfort”.

24 Calculated with a constant theoretical capacity of 6 spaces/m² in order to allow a comparison; the official statistics count 4 people standing/m² as of 2005.

25 In addition to the 31 stations in Brussels, 15 stations are being considered in the different studies for the RER network [Lebrun & Dobruszkes, 2012].

Haut de page

Table des illustrations

Titre Figure 1. Length of route (km), tram, bus (including trolley bus) and underground
Légende This indicator reflects the coverage of the Region by the STIB network, which has been extended according to the urbanisation of Brussels. This indicator does not provide information regarding the operation of the route (How many lines go along it? What are the frequencies?), but instead presents a static view of the geographical coverage of the territory. At the very least, urban sprawl must cause this indicator to increase in order to ensure constant service.
Crédits Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017)
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-1.png
Fichier image/png, 56k
Titre Figure 2. Length of line (km), tram, bus (including trolley bus) and underground
Légende This indicator shows the volume of the direct connections between the different neighbourhoods. When several lines go through a location, they connect it directly to several neighbourhoods in the city. This is an indicator of “spatial” comfort [Lebrun, 2018]. The lengths of underground and tram networks (km-route and km-line) are proportionate to the length of service of each of the lines during the inaugural year, whereas the official figures for the situation on 31 December could suggest that they were in service for 12 months; this concerns in particular the global restructuring on 1 July 2007 and 2008 and the different extensions of the underground.
Crédits Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017)
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-2.png
Fichier image/png, 67k
Titre Figure 3. Km-convoys (million km), tram, bus (including trolley bus) and underground
Légende The kilometric production reflects both network meshing and vehicle frequency. It involves the total number of kilometres covered in a year by all of the trams, buses and underground. The indicator increases when the network grows (creation or extension of lines) or when the average vehicle frequencies are improved. It could be considered more as an indicator of “time-based” comfort. The km-convoys include the kilometres covered by the sum of the different vehicles which make up a convoy (i.e. for trams, an engine with a trailer until 1975, and for the underground, all of the carriages in a train). As of 1995, neither the “empty km” connecting the line to the depot nor the special transports are counted.
Crédits Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017)
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-3.png
Fichier image/png, 66k
Titre Figure 4. Spaces-km (billions with 6 spaces/m2), tram, bus (including trolley bus) and underground
Légende This indicator is linked to km-convoys and the size of vehicles. The size of vehicles varies in large proportions. Once again, this indicator is a global reflection of the service provided by each of the three modes, without any slight geographical or time differences. Instead, it is an indicator of “physical” comfort. The official statistics were the object of a methodological modification: as of 2005, the theoretical capacity of vehicles has been based on 4 people standing per m² instead of the previous 6. This has a different impact on trams, buses and the underground given that the proportion of standing room within the total number of spaces is not the same.
Crédits Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017)
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-4.png
Fichier image/png, 57k
Titre Figure 5. Average frequency (minutes), tram, bus (including trolley bus) and underground
Légende This indicator gives an idea of the service via the average waiting time; it is different from the experience of passengers as it covers an extremely variable range of situations according to the different times (day, evening, weekend, school holidays, etc.) and neighbourhoods (differences between modes and according to the density of lines). These significant variations give an annual average which provides a relevant indication of the level of the service, knowing that the passenger satisfaction survey highlights the importance of frequency. This indicator is even more important when the journey includes one or more connections [Dobruszkes et al., 2011], even if the recent progress in terms of information has reduced the uncertainty related to waiting times. The average frequencies were calculated based on km-convoys, lengths of lines and 19 hours of service per day.
Crédits Source: calculations by the author based on Tramways Bruxellois (1950-1953) and STIB (1954-2017)
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-5.png
Fichier image/png, 97k
Titre Figure 6. Number of passengers (millions), tram, bus (including trolley bus) and underground
Légende This indicator integrates the sales, survey estimates of journeys with passes and unpaid journeys (regular fraud, passengers in big crowds where almost nobody pays); it takes into account the tickets with special rates and variations in the categories of beneficiaries. For the method used to count passengers, see chapter 5 of the 2ème Cahier de l'Observatoire de la mobilité [Lebrun et al., 2013]. In 2010, a statistical correction concerning the distribution of passengers between modes was made using more precise data thanks to MOBIB ticket validation; trams and buses therefore gained passengers (31 % and 9 % respectively) to the detriment of the underground (-21,7 %).
Crédits Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017)
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-6.png
Fichier image/png, 103k
Titre Figure 7. Occupancy rate (6 passengers/m2), tram, bus (including trolley bus) and underground
Légende This represents the relationship between the annual number of passengers and the number of spaces-km, based on the hypothesis that the average journey is 4,4 km (based on a STRATEC survey for STIB) and that the capacity of vehicles remains constant (6 people standing per m2) in order to obtain homogeneous series.
Crédits Source: calculations by the author based on Tramways Bruxellois (1950-1953) and STIB (1954-2017)
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-7.png
Fichier image/png, 88k
Titre Figure 8. Excerpt from brochure N°4 of the Brussels underground for De Brouckère station (1969)
Crédits Source: collection V. Carton
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-8.png
Fichier image/png, 7,0M
Titre Figure 9. Coverage of the proceedings from the conference “The Future of Urban Transport” organised by the Greater Brussels Council (1985)
Crédits Source: collection V. Carton, illustration: François Schuiten
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-9.jpg
Fichier image/jpeg, 756k
Titre Figure 10. Employment, population, number of passengers (index 1950=100)
Légende These three data are presented based on a level 100 in 1950.
Crédits Source: Tramways Bruxellois (1950-1953) and STIB (1954-2017), IBSA
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-10.png
Fichier image/png, 76k
Titre Figure 11. The renovated Schuman station provides new comfort to passengers
Crédits Source: photo V. Carton, 2018
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-11.png
Fichier image/png, 1,8M
Titre Figure 12. The 3000 and 4000 series trams increased the capacity of the vehicle fleet
Crédits Source: photo V. Carton, 2018
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-12.png
Fichier image/png, 2,0M
Titre Figure 13. Number of journeys per inhabitant per year
Légende This involves the relationship between the number of journeys made per year in the network and the number of inhabitants in the urban area (19 municipalities), providing an indicator of the rate of use of STIB by the inhabitants of Brussels, even if certain journeys are made by commuters and visitors, and if certain STIB lines go beyond the regional boundaries, whereas the operators in the other two Regions provide service in Brussels.
Crédits Source: calculations by the author based on Tramways Bruxellois (1950-1953) and STIB (1954-2017)
URL http://journals.openedition.org/brussels/docannexe/image/1769/img-13.png
Fichier image/png, 63k
Haut de page

Pour citer cet article

Référence électronique

Vincent Carton, « Public transport service and use in Brussels from 1950 to 2017 »Brussels Studies [En ligne], Collection générale, n° 127, mis en ligne le 17 septembre 2018, consulté le 19 mars 2024. URL : http://journals.openedition.org/brussels/1769 ; DOI : https://doi.org/10.4000/brussels.1769

Haut de page

Auteur

Vincent Carton

Civil engineer and town planner, professor of town planning at EFP, member of the Management Committee of the Atomium, former director of Bruxelles-Environnement IBGE and former deputy head of cabinet of the Ministre fédérale de la Mobilité. Member of the Management Committee of STIB from 2001 to 2014 and of the Port of Brussels. In 1995, he launched the Délégation au Développement du Pentagone, which was in charge of the revitalisation of the historical centre of Brussels. He taught urbanism at La Cambre school of architecture. vincentcarton1[at]gmail.com

Haut de page

Droits d’auteur

CC-BY-4.0

Le texte seul est utilisable sous licence CC BY 4.0. Les autres éléments (illustrations, fichiers annexes importés) sont « Tous droits réservés », sauf mention contraire.

Haut de page
Rechercher dans OpenEdition Search

Vous allez être redirigé vers OpenEdition Search